Call Now
Freestanding black soaking tub with textured tile wall

Service

Bathroom Remodeling

A bathroom remodel lives or dies on waterproofing, layout, and the quality of the materials touching water every day — long before anyone notices the tile pattern. Hickok Homes treats every bathroom renovation, from a compact powder room refresh to a full primary suite reconfiguration, with the same waterproofing discipline and structural attention we bring to a ground-up custom home, because a beautiful bathroom that leaks into the floor below is not actually a finished project.

Once the structural and waterproofing fundamentals are right, we focus on the details that make a bathroom feel like a genuine retreat: curbless walk-in showers, freestanding soaking tubs, full-height tile work, dual vanities with thoughtful storage, and lighting calibrated for both task use and a calmer, spa-like mood. We have built primary bathrooms with sculptural tile showers and powder rooms with statement stone, and in every case, the goal is the same — a space that holds up to daily use for fifteen years while still photographing like the day it was finished.

Why Clients Choose This Service

  • Waterproofing and structural detailing handled to the same standard as our ground-up custom homes.
  • Curbless and zero-threshold walk-in shower design for a cleaner, more accessible look.
  • Custom tile layouts, natural stone, and premium plumbing fixtures sourced through trusted suppliers.
  • Lighting design tuned for both grooming tasks and a relaxed, spa-like atmosphere.
  • Full management of plumbing relocation for primary suite and layout reconfigurations.

Our Process

How We Approach Bathroom Remodeling

  1. 01

    Design Consultation

    We review your existing bathroom, discuss layout goals, and identify any plumbing or structural considerations.

  2. 02

    Design & Material Selection

    Tile, stone, fixtures, vanities, and lighting are finalized into a complete, cohesive design.

  3. 03

    Budget & Scheduling

    A transparent budget and project schedule are confirmed before demolition begins.

  4. 04

    Construction & Waterproofing

    Our trade partners execute demolition, waterproofing, tile, and fixture installation under close supervision.

  5. 05

    Final Walkthrough

    Every detail, from grout lines to hardware, is reviewed before we consider the project complete.

Gallery

Bathroom Remodeling Photos

FAQs

Bathroom Remodeling — Frequently Asked Questions

How long does a bathroom remodel take?

A full primary bathroom remodel typically takes 6 to 10 weeks, while a powder room refresh can often be completed in 3 to 4 weeks, depending on material availability.

Can you convert my tub into a walk-in shower?

Yes, tub-to-shower conversions, including curbless walk-in designs, are one of our most requested bathroom upgrades.

Do you handle custom tile work?

Yes, full-height custom tile, natural stone, and decorative patterns are a core part of our bathroom remodeling work.

Ready to Start?

Talk to Us About Your Bathroom Remodeling Project

Schedule a Consultation